24’’ Sewer Repair By admin | On April 9, 2014 | in High Desert Underground, Sewer Repair with Comments Off on 24’’ Sewer Repair Sewer Encasement – City of Victorville – 2012 This 24” live sewer floated during a major storm event. We lowered it back into place and encased it in concrete without disturbing the flow (without a bypass).