Underground Rehabilitation – CH2M Hill – 2014 Insert 14” HDPE Pipe inside of approximately 1,300 LF of bad 16” CML&C pipe. Reconnect to existing 16” CML&C at end of bad section.
Category Archives : Underground Rehabilitation RSS feed for this section
Fort Irwin Drying Bed Rehabilitation Project
Sewer Sludge Drying Bed Re-construction – CH2M Hill – 2011 Additional Information: Rebuilt 21 sewer sludge drying beds. Re-habilitation included plumbing, sub-liner & liner installation, rock, and sand filter.