Sewer Sludge Drying Bed Re-construction – CH2M Hill – 2011 Additional Information: Rebuilt 21 sewer sludge drying beds. Re-habilitation included plumbing, sub-liner & liner installation, rock, and sand filter.
Category Archives : Sewer Treatment RSS feed for this section
Temporary Sewer Treatment and Mixing Station
Design Build – City of Victorville – 2011 We performed a Design Build piping system to remove water from the Sewer system, treat it for high PH and then mix the effluent before returning it to the Sewer Main.