
Underground Rehabilitation – CH2M Hill – 2014 Insert 14” HDPE Pipe inside of approximately 1,300 LF of bad 16” CML&C pipe. Reconnect to existing 16” CML&C at end of bad section.
Underground Sewer and Water Construction – US Army Corps of Engineers and CDM Smith – October 2013 Additional Information: Installation of approximately 50,000 LF of PVC pipe and cathodically protected appurtenances ranging in size from 6” to 24” throughout US National Training Center, Fort Irwin. This pipe will facilitate the new water treatment plant currently underway at [...